Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
Problem:
After about 165m of driving, water and sand from the ridge of the calotte of the U9 elm adit (north) penetrated during an exploratory drilling. The stratigraphic section shows that about 1 m above the ridge there is a water dam about 1 m thick, which dips flat into the tunnel profile in the direction of driving. Above it there is fine saturated fine sand.
Stabilization and sealing by injection.

Adjustable, rapid-reacting acrylate gel
Copyright © 2025 IC - All Rights Reserved.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.